RAISED BED A PLUS

RAISED BED A PLUS


RAISED BED A PLUS

Instructions:
1. Layout 1/2” Main Line to boxes using directional fittings provided in kit. See sample layouts on page 2 and 3.
2. Once 1/2” line is in place, use hole punch to poke into line at desired row location (take care to ensure the hole is punched at a 90 degree angle to the intended row to minimize leaking at the main line.
3. Cut 1/4” Drip Emitter Tubing to desired length for each row, and insert a DD-C250 into one end of the tubing (this makes it easier to insert into your 1/2” line)
4. Insert DD-C250 into pre-punched holes.
5. Secure with stakes provided in kit.
6. Assemble Water Source Connections as shown in illustrations and attach main line using the Perma Lock fittings provided in the kit.

7.For the additional individual plant system: Layout 1/2" header, connect DD-C250 to header line and attach 1/4" dripline (DD-DH250-50). At the other end of the 1/4" poly micro connect a DD-SPCV05. Use DD-S2 to stake into soil and support the emitter.

Winterization Tips 

1. Remove Timer (if installed on your system), filter, and pressure regulator and store indoors.
2. Remove End Caps (DL-EC600) from main lines, Goof Plugs do not need to be removed. Allow lines to self drain, and or blow out lines with a Shop Vacuum or similar (do not use heavy compression air to blow out lines. Replace Caps. Drip Irrigation Lines are usually very tolerant to winter so some water in the lines will not usually have any impact on system performance year to year.
 

Purchase Here:

Maintenance Tips:  

WINTERIZING: For instructions click here

For more information on Drip Irrigation Design and Installation click here